Our Portfolio

Expertise

During the last 3 years our company had executed more than 60 projects in the field of:

  1. Operation & Maintenance of 26 generating stations all over Iraq with the total capacity of 260 MW. Each station consists of 8×1.25 MW SDMO generators
  2. Installing and Commissioning a GE Frame 6B 40MW Power Station in Samawa.
  3. Wells Drilling and Rehabilitation in Sinjar
  4. Supplying, installing, testing and placing in service 11 new 33/11kV substations, including power transformer, 33kV & 11kV switchgear and all the auxiliary equipment required, in Karbalaa, Al Qadeseya, Falluja, Deyala and Baghdad Governorates .Also a rehabilitation of 2 (33/11kV) substations one in Falluja and the other in Albdeer/ Al Qadisiyah Governorate.

Projects

Brief on some of FD supporting projects

Operation and Maintenance for the Power generation Stations:

FD staff was the first Iraqi staff which participated in the execution of a 15-month contract to operate and maintain 26 generating sites all over the Iraqi Governorates, Each station consists of 8×1.25 MVA SDMO generators, with a total capacity of 260MVA, using the state of the art technologies in maintaining and operating all generators and synchronizing them to the national grid through the medium voltage network.

  • Calculating and controlling the whole process is achieved through the main Operation Centre, located in Baghdad, multiple working shifts, 24 hours 7 days a week, have been followed in all sites to achieve the required energy production as shown in the below map.

  • The Operation centre comprises elite of highly qualified engineers who were assigned to follow the performance of power plants. They did so, through computers sets that are connected with those of the power plants sites, through satellite. Mobiles and Thurya cells were provided in addition to the land telephones to guarantee the processes of information exchanging.

  • The maintenance centre, to achieve the best quality work, they divided the sites of the power plants into 4 regional groups, the northern. the mid, mid Euphrates and the southern regions, to control processes of immediate maintenance and repair, and hence taking the required actions, round the day.

  • The repair centre set up a new mechanism for the maintenance of electronic cards related to the control system of the generators, despite the unavailability of the circuit diagrams.

  • This was achieved by, drawing all the circuit diagrams of the electronic cards, to understand the functions of its different stages, as well as the specification of their electronic components.

This simplified and speeded the repair of the cards. It was also making it possible to manufacture them locally in case of impossibility of importing them (e.g. they are obsolete). also they Solved the codes of the programmable integrated circuits.

Ammara 400/132/33 KV Substation:

The substation consists of 400 KV region, 132 KV region, Control and relay building for voltage 132 KV, Two Control and relay buildings for voltage 11KV, Cable trenches, Drainage system, Roads and all supporting facilities. And subsequently doing all that is necessary for testing and commissioning of the station. The station located on area of about 165,000 square meters and we did all the following actions:

  • Site survey, grading and compaction the soil.

  • Open roads and facilitate access to the site.

  • Build up sewerage and drainage system.

  • Water supply and water distribution networks.

  • Construction of roads, walkways and parking.

  • Processing and setting up of cable trenches, canals and buried pipes for all the station.

  • Casting of the foundations, towers foundation and transformers foundations 1006 device base, and about 23 different kinds of foundations.

  • Construct three control and relay building and garage for machines and vehicles.

  • Doing the testing and commissioning in preparation to the final energizing of the station.

Ammara 400/132/33 KV Substation
Ammara 400/132/33 KV Substation
Ammara 400/132/33 KV Substation
Ammara 400/132/33 KV Substation

Dokan-Sulaymaniyah City Water Network

Maintain, repair, replace water pump equipment and train staff on operation and maintenance at the Dokan water Supply Project and water pumping stations which provide potable water via a 70cm pipeline from Dokan Lake to Sulaymaniyah City and province of S

Supply materials, install, commission, and test all items and annexes of the water project and LS1, LS2 and LS3 pumping stations for Dokan – Sulaymaniyah water supply project. Carry out all transport, loading and unloading of the required materials and arrange the training on operating and maintaining the equipment for the staff of the water directorate of Sulaymaniyah.

  • Assembling and maintenance of the following Vertical turbine Pumps from SULZER and IDP (Ingersoll Dressing Pumps) o Sulzer pumps 3 numbers in the LS1 of Q=1800 m3/hr, Head=132 m, Power 700Kw including changing impellers, bushes and bearings and all other requirements. o IDPS pumps 3 numbers in the LS1 of Q=1800 m3/hr, Head=132 m, Power 700Kw including changing impellers, bushes and bearings and all other requirements. o Sulzer pumps 3 numbers in the LS2 of Q=1625 m3/hr, Head=254 m, Power 1350Kw including changing impellers, bushes and bearings and all other requirements. o Sulzer pumps 3 numbers in the LS3 of Q=1625 m3/hr, Head=295 m, Power 1850Kw including changing impellers, bushes and bearings and all other requirements.

  • Provision and installation of flow meters on main pipe lines DN 600 mm electro-magnetic water meter with 16 bars working pressure in LS1, LS2, LS3 and Sherkozh reservoir.

  • Maintenance of electrical stations and transformers, new incoming feeders 33KV for distribution boards and switch boards for operating motors in LS1, LS2 & LS3.

  • Replacement of incoming electrical feeder 33 KV in LS1 & LS2.

  • Mechanical and electrical Maintenance of filtering system and replacement of filter media.

  • Training of 40 staff and 4 engineers on Dokan Water Supply Project operation and maintenance and pumps installation.

  • Supply of tool and provision of all electrical spare parts.

  • Supply of laboratory equipment.

  • Civil & Electrical lighting maintenance of all building in LS1, LS2 & LS3.

Dokan-Sulaymaniyah City Water Network
Dokan-Sulaymaniyah City Water Network
Dokan-Sulaymaniyah City Water Network
Dokan-Sulaymaniyah City Water Network

Power Plant Construction:

Install, and Commission a GE Frame 6B 40MW Power Station in Samawa. This project includes install all the parts, as well as modify the ventilation unit to suit the weather of the area.

This project is a fruitful coordination with The Foster Group LLC. This station will serve the people of Samawa (280 km South West of Baghdad), since it is located at the outskirt of the city.

Power Plant Construction

Gas turbines, Erection and Maintenance:

  • Supply spare parts for ALQudis & Taji Gas Turbine plant At MOU Program from 1998-2002 with course of training to MOE Engineers in TSL factories in USA for 2 weeks summer 2004.

  • Construction foundation for Gas Turbine Units in AL Mussaib & Baghdad South Power plant as sub-contractor 2004-2005.

  • Install and operation Gas Turbine Unit in Baghdad South power plant & AL Samawa Cement Factory.2004-2005.

Gas turbines, Erection and Maintenance
Gas turbines, Erection and Maintenance
Gas turbines, Erection and Maintenance